Extension Shell Build
In Wimbledon, 2023
We delivered a complete extension shell build in Wimbledon over a 2.5-week programme. The works included full site excavations, installation of all underground drainage, reinforced concrete slab construction, and cavity blockwork up to the required level. The project provided a solid, compliant, and weather-ready base, prepared for brickwork and the superstructure above.